Lamma-Gung {L_WROTE}:
The rumours seem to be that the high-capacity, state-of-the-art fiber from SKW (head connection) to YSW is for the ex-Lamma Quarry new town, to be built by a company in the same Li-ka Shing conglomerate as HGC.
Patient long-term planning by HGC, 5,000 brand-new, easy-to-connect customers in high-rises up to 13 floors in a number of years... No plans for YSW in the near future.
That makes even less sense.
Anyone can speculate, I do it myself, but you need to account for the facts.
Why not just connect from where the tunnel makes landfall between SKW and Pak Kok?
Why on earth would they lay fibre up YSW Main Street if this is for the quarry?
There won't be 5000 people in the quarry for at least 10 years, if ever; there are 5000 people in Yung Shue Wan NOW who would probably 95% sign up for fibre.
Half the cost, 50 times the speed. Say goodbye to PCCW forever.
This was done years before the quarry project was mooted.
The fibre will be old and generations out of date by the time the quarry project is built.
They can and probably will just put up a microwave relay on the hillside, simple line of sight to HK for it.
Lamma-Gung {L_WROTE}:
But there seems to be a PCCW Broadband upgrade in the plans at corporate level (VDSL2), unknown even to our PCCW modem fixing guy(s). But it will probably cost each house an undetermined amount to connect, new hardware, cable, etc. Maybe 8 Mbps or even 20+..
https://en.wikipedia.org/wiki/Very-high ... ber_line_2"The main high-speed link (e.g. a fibre optic connection) terminates at a hub near the customers' location. The existing copper wire infrastructure is then used to carry the high speed connection for the short remaining distance to the customers. "
So we'd still be using the crappy phone lines hanging off trees and tacked to walls, where they are struck by lightning and blow up our computers every few months.
Great.
And to do this they need to lay a fibre trunk anyway.
The problem we're suffering from is demand exceeding supply via the uplink to HK. That's the main bottleneck.
We need a much fatter uplink before speeding up the "last mile" can make any difference.
I can see why PCCW would like this VDSL2; it requires you to have a copper landline, so they can keep ripping us off for that as well, instead of ditching them to use mobile and/or IP phones as you would obviously do if you have a fibre-to-home connection.